WARNING: This product contains nicotine, nicotine is an addictive chemical.

ODM/Wholelsale

ODM/Wholelsale

VEIIK vape r&d wholesaler Specially targeted on the high-end professional pod system device.Factory covers an area of 8,000 square meters, including 5,000 square meters of dust-free workshops, with 500 production line employees.Strong R&D team and 30 quality inspectors and operations management teams

Contact Info

AFTER-SALE POLICY

After the disposable vape export, if the product is defective within the 6-month warranty and is used correctly and safely, customers have the right to ask for product replacement after confirmation from VEIIK or its authorized partners,we will send you a replacement in your next order.

  • Customers provide evidence: send us the pictures and videos of the defective products, and provide the details of the problem.
  • The customer counts the quantity of defective products.
  • Our engineer department/QC department/production department analyze the problem and find out the solution.
  • If the problem is caused by our improper production, our company will send a replacement for the defective product in the next order. The buyer is responsible for the shipping cost of the return and the seller is responsible for the shipping cost of resending the replacement.

Only the same model or other models of the same value will be used for replacement as a negotiation
between VEIIK and customers.VEIIK reserves customers' rights to choose their favorite flavors during the after-sales process
but when the specified flavor is out of stock, random flavors will be selected for replacement.
After-sales service will be limited to the options available in the original country where the product was purchased.

The chart below shows how OEM/ODM works

1
ID Design 9Days
2
Structural Design 4Days
3
Control Board Confirmation 3Days
4
Prototype 10Days
5
Control Board Confirmation 3Days
6
Collection of Feedback and Advice for Prototype 5Days
7
Files of Control Board Revising and mold making 3Days
8
Mold T0 15-20Days
9
Sample Assembling and testing 3Days
10
Mold T1 4Days
11
rial production 12Days
12
Estimating all 72-87Days